Seal BUILDING
Permit Payment Receipt


CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/2/2021 PERMIT SUB-TYPE: SNEW PERMIT NO: B21-03691
JOB ADDRESS:
6242 BLYTHE DR
FRISCO, TX 75035
DESC:   1717 AC, 2217 SF, 2 STORY
OWNER:
GABLES LLC MEGATEL
2101 CEDAR SPRINGS RD STE 700
DALLAS TX 75201-1504

CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700
Dallas TX 75201
ISSUED DATE:
11/2/2021
APPLIED DATE:
11/1/2021
EXPIRED DATE:
2/7/2024
SITE APN:
ADD159041
STATUS:
COMPLETED
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700
Dallas TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$10.00
GAS RELEASE 07/13/2023 DOT$30.00
2NDS AND FRAMING 01/11/2023 DW2$30.00
FLATWORK RES 06/23/2023 DW2$30.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.20
PERCENT CREDIT CARD FEE$0.00
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$2.60
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
AUTO PROCESSING FEE$0.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$780.29
RESIDENTIAL FEE$66.51
RESIDENTIAL MECHANICAL FEE$139.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$206.00
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$1,939.00
2NDS AND FRAMING 05/04/2023 RWK$30.00
FIRE RATED WALL RES 07/26/2022 RWT$30.00
UTILITIES INSPECTION 07/21/2023 TL$100.00
Total Fees:$6,010.50
______  METER PAYMENT
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  INSULATION RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
Notes: