|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/30/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-03492
|
JOB ADDRESS: 3718 HOLLOW PINE DR FRISCO, TX 75033 |
DESC:
3155 AC, 3934 SF, 2 STORY |
|
OWNER:
GRBK EDGEWOOD LLC
2805 DALLAS PKWY STE 400 PLANO TX 75093-8722
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 7/30/2021
APPLIED DATE:7/30/2021
EXPIRED DATE:1/11/2023
SITE APN:ADD239243
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE RES 11/10/2021 BC | $30.00 |
FLATWORK RES 12/08/2021 BC | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
CO AND BUILD FINAL 07/12/2022 CAB | $30.00 |
PLAN REVIEW FEE | $50.00 |
2NDS AND FRAMING 03/09/2022 DC2 | $30.00 |
DRYWALL RES 03/30/2022 DC2 | $30.00 |
DRYWALL RES 03/31/2022 DC2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $1.40 |
CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $0.60 |
T-POLE RES 11/08/2021 JDW2 | $30.00 |
PLUMBING ROUGH-IN 11/22/2021 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,373.22 |
RESIDENTIAL FEE | $118.02 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $249.00 |
SEWER IMPACT FEE | $2,344.00 |
WATER IMPACT FEE | $2,254.00 |
AUTO PROCESSING FEE | $131.08 |
2NDS AND FRAMING 03/02/2022 RWK | $30.00 |
2NDS AND FRAMING 03/08/2022 RWK | $30.00 |
UTILITIES INSPECTION 06/13/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
MISCELLANEOUS FEE | $10.00 |
Total Fees: | $8,506.02 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ T-POLE RES |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|