|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/1/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-03382
|
JOB ADDRESS: 4173 WILLOW POND DR FRISCO, TX 75034 |
DESC:
2176 AC, 3131 SF, 3 STORY |
|
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 4/1/2022
APPLIED DATE:3/29/2022
EXPIRED DATE:5/15/2024
SITE APN:ADD204088
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Jacobs
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
FIRE RATED WALL RES 05/22/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $3.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $13.20 |
SLAB RES 07/26/2022 GLQ | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
PLUMBING ROUGH-IN 06/22/2022 MLM | $30.00 |
PTO AND MECH ROUGH 05/30/2023 MLM | $30.00 |
PTO AND MECH ROUGH 06/13/2023 MLM | $30.00 |
PTO AND MECH ROUGH 06/15/2023 MLM | $30.00 |
PTO AND MECH ROUGH 06/21/2023 MLM | $30.00 |
PTO AND MECH ROUGH 06/19/2023 MRT | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,104.54 |
RESIDENTIAL FEE | $93.93 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $122.73 |
AUTO PROCESSING FEE | $1.00 |
AUTO PROCESSING FEE | $1.60 |
SHEATHING RES 06/12/2023 RWK | $30.00 |
2NDS AND FRAMING 06/26/2023 RWK | $30.00 |
2NDS AND FRAMING 07/13/2023 RWK | $30.00 |
INSULATION RES 07/18/2023 RWK | $30.00 |
DRYWALL RES 07/28/2023 RWK | $30.00 |
PLUMB MECH FINAL 11/09/2023 SDC | $30.00 |
PLUMB MECH FINAL 11/13/2023 SDC | $30.00 |
UTILITIES INSPECTION 11/07/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $8,360.40 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|