|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/15/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-03171
|
JOB ADDRESS: 4253 WILLOW POND DR FRISCO, TX 75034 |
DESC:
2512 AC, 3058 SF, 3 STORY *MODEL* |
|
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 9/15/2021
APPLIED DATE:9/15/2021
EXPIRED DATE:4/20/2024
SITE APN:ADD204093
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Jacobs
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRYWALL RES 03/15/2023 CMM2 | $30.00 |
PLAN REVIEW FEE | $100.00 |
2NDS AND FRAMING 02/06/2023 DC2 | $30.00 |
2NDS AND FRAMING 02/10/2023 DC2 | $30.00 |
2NDS AND FRAMING 02/20/2023 DC2 | $30.00 |
DRYWALL RES 03/09/2023 DC2 | $30.00 |
DRYWALL RES 03/20/2023 DC2 | $30.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
PTO AND MECH ROUGH 08/24/2022 DOT | $30.00 |
FLATWORK RES 09/11/2023 DP2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $7.40 |
PERCENT CREDIT CARD FEE | $0.80 |
2NDS AND FRAMING 02/13/2023 GLQ | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
RESIDENTIAL NEW PERMIT FEE | $1,079.72 |
RESIDENTIAL FEE | $91.74 |
RESIDENTIAL MECHANICAL FEE | $172.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $271.00 |
AUTO PROCESSING FEE | $124.89 |
INSULATION RES 02/27/2023 RWK | $30.00 |
FLATWORK RES 06/09/2023 RWK | $30.00 |
ELECT FINAL RES 06/12/2023 RWK | $30.00 |
PLUMBING ROUGH-IN 11/16/2021 SDC | $30.00 |
REPLACE READABLE REGISTER | $310.00 |
Total Fees: | $7,986.05 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ WATER REGISTER |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|