Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/17/2021 PERMIT SUB-TYPE: MNEW PERMIT NO: B21-03116
JOB ADDRESS:
4250 GRIDIRON RD
FRISCO, TX 75034
DESC:   539144 SF, THE CASEY
OWNER:
FRISCO UL3 PARTNERS LP

FORT WORTH TX 76177-1552

CONTRACTOR:
Rampart Multifamily , LLC
800 Industrial Blvd
Grapevine TX 76051
ISSUED DATE:
11/17/2021
APPLIED DATE:
6/15/2021
EXPIRED DATE:
11/11/2024
SITE APN:
ADD288260
STATUS:
ISSUED
APPLICANT:
Monica Miranda
8340 Meadow Road
Dallas TX 75231
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
2880000
FEE SUMMARY
INSPECTION SUMMARY
DRYWALL COMM 06/21/2023 DC2$35.00
FRAME COMM 08/24/2023 DC2$35.00
FRAME COMM 09/28/2023 DC2$35.00
DRYWALL COMM 10/12/2023 DC2$35.00
FRAME COMM 10/24/2023 DC2$35.00
DRYWALL COMM 10/24/2023 DC2$35.00
DRYWALL COMM 11/02/2023 DC2$35.00
DRYWALL COMM 11/14/2023 DC2$35.00
DRYWALL COMM 11/15/2023 DC2$35.00
ELECT FINAL COMM 11/16/2023 DC2$35.00
CREDIT CARD FEE$1.40
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$1.40
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$2.70
PERCENT CREDIT CARD FEE$2.14
PERCENT CREDIT CARD FEE$2.14
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$1.40
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$5.60
PERCENT CREDIT CARD FEE$4.20
PERCENT CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$0.70
SET 6IN CMPND METER 05/17/2023 HDJ$100.00
FIRE FINAL 01/19/2024 JS3$50.00
AUTO PROCESSING FEE$6.00
COMMERCIAL FEE$21,595.76
COMMERCIAL BUILDING PERMIT FEE$6,620.34
COMMERCIAL MECHANICAL FEE$26,987.20
COMMERCIAL NEW APPLICATION FEE$300.00
COMMERCIAL PLUMBING FEE$48,552.96
SEWER IMPACT FEE$90,396.00
THOROUGHFARE IMPACT FEE$108,488.00
WATER IMPACT FEE$91,446.00
AUTO PROCESSING FEE$2.00
PLAN REVIEW FEE$100.00
SLAB COMM 08/10/2022 REED$35.00
FRAME COMM 05/19/2023 REED$35.00
FRAME COMM 06/14/2023 REED$35.00
FRAME COMM 06/20/2023 REED$35.00
LATH COMM 08/23/2023 REED$35.00
INSULATION COMM 09/15/2023 REED$35.00
FRAME COMM 09/20/2023 REED$35.00
INSULATION COMM 11/17/2023 REED$35.00
DRYWALL COMM 11/29/2023 REED$35.00
FIRE FINAL 12/13/2023 RJB$50.00
PLUMB TOP OUT COMM 10/10/2022 SDC$35.00
PLUMBING ROUGH-IN 10/10/2022 SDC$35.00
PLUMB TOP OUT COMM 10/11/2022 SDC$35.00
PLUMBING ROUGH-IN 10/12/2022 SDC$35.00
PLUMBING ROUGH-IN 11/23/2022 SDC$35.00
PLUMBING ROUGH-IN 11/28/2022 SDC$35.00
PLUMBING FINAL 10/02/2023 SDC$35.00
MECHANICAL FINAL 10/05/2023 SDC$35.00
PLUMB TOP OUT COMM 10/18/2023 SDC$35.00
PLUMB TOP OUT COMM 10/23/2023 SDC$35.00
MECHANICAL FINAL 10/26/2023 SDC$35.00
PLUMB TOP OUT COMM 04/18/2023 SME2$35.00
PLUMBING ROUGH-IN 04/22/2022 SMH$35.00
PLUMBING ROUGH-IN 04/26/2022 SMH$35.00
PLUMB TOP OUT COMM 08/04/2023 SMH$35.00
MECHANICAL FINAL 02/21/2024 SMH$35.00
6 INCH COMP METER$5,770.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
Total Fees:$402,819.94
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PAVING
______  ELECT ROUGH COMM
______  FLATWORK COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PAVING
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PAVING
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  CMUWALL
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  T-POLE COMM
______  SLAB COMM
______  FOOTINGS COMM
______  INSULATION COMM
______  CMUWALL
______  SHEATHING COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  ELECT ROUGH COMM
______  T-POLE COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  SLAB COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  PAVING
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  FRAME COMM
______  SET 6IN CMPND METER
______  FIREINSULATION
______  METER PAYMENT
______  FRAME COMM
______  INSULATION COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  SET 6IN CMPND METER
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  FRAME COMM
______  FIREINSULATION
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  INSULATION COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  DRYWALL COMM
______  FRAME COMM
______  FRAME COMM
______  DRYWALL COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  FRAME COMM
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  SHEATHING COMM
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  FIREINSULATION
______  SHEATHING COMM
______  FIREINSULATION
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  INSULATION COMM
______  GAS PRESSURE
______  FIREINSULATION
______  BRICKWALL TIE COMM
______  GAS PRESSURE
______  DRYWALL COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  GAS PRESSURE
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  INSULATION COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  CEILING
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  CEILING
______  INSULATION COMM
______  DRYWALL COMM
______  SHEATHING COMM
______  FIRE RATED WALL COMM
______  SHEATHING COMM
______  LATH COMM
______  CEILING
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  LATH COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  LATH COMM
______  DRYWALL COMM
______  ELECT RELEASE COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  LATH COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  LATH COMM
______  MISC FRAME COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  FRAME COMM
______  FIREINSULATION
______  ELECT ROUGH COMM
______  LATH COMM
______  LATH COMM
______  ELECT ROUGH COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  MECHANICAL FINAL
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  FIREINSULATION
______  LATH COMM
______  PLUMBING FINAL
______  FRAME COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  FRAME COMM
______  PLUMBING FINAL
______  FRAME COMM
______  ELECT FINAL COMM
______  FIREINSULATION
______  INSULATION COMM
______  LATH COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  DRYWALL COMM
______  DRYWALL COMM
______  MECHANICAL FINAL
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  FRAME COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  INSULATION COMM
______  PLUMBING FINAL
______  PLUMB TOP OUT COMM
______  MECHANICAL FINAL
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  FIREINSULATION
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  FRAME COMM
______  DRYWALL COMM
______  PLUMBING FINAL
______  MECHANICAL ROUGH
______  FRAME COMM
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  DRYWALL COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  INSULATION COMM
______  MECHANICAL FINAL
______  FIREINSULATION
______  STOCK AND FURNISH
______  ELECT ROUGH COMM
______  FRAME COMM
______  GAS PRESSURE
______  PLUMBING FINAL
______  MECHANICAL ROUGH
______  ELECT FINAL COMM
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  PLUMBING FINAL
______  MECHANICAL ROUGH
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT ROUGH COMM
______  INSULATION COMM
______  FRAME COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  INSULATION COMM
______  DRYWALL COMM
______  FIREINSULATION
______  INSULATION COMM
______  FIREINSULATION
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT ROUGH COMM
______  ELECT FINAL COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  PLUMBING FINAL
______  FIREINSULATION
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  DRYWALL COMM
______  DRYWALL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  MECHANICAL FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  DRYWALL COMM
______  ELEVATOR
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT RELEASE COMM
______  MECHANICAL FINAL
______  FOOTINGS COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  FIRE FINAL
______  COMM CO
______  PLUMBING FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FOOTINGS COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  COMM CO
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  PLUMBING FINAL
______  COMM CO
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PAVING
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  FLATWORK COMM
______  FIRE FINAL
______  FIRE FINAL
______  ELEVATOR
______  COMM CO
______  GAS RELEASE
______  COMM CO
______  ELEVATOR
______  ELEVATOR
______  INSPECTION ASSIST
______  ELEVATOR
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)