|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/9/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02978
|
JOB ADDRESS: 3606 HOLLOW PINE DR FRISCO, TX 75033 |
DESC:
3353 AC, 4053 SF, 2 STORY |
|
OWNER:
GRBK EDGEWOOD LLC
2805 DALLAS PKWY STE 400 PLANO TX 75093-8722
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 6/9/2021
APPLIED DATE:6/9/2021
EXPIRED DATE:12/14/2022
SITE APN:ADD239238
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 01/27/2022 BC | $30.00 |
2NDS AND FRAMING 02/01/2022 DC2 | $30.00 |
2NDS AND FRAMING 02/02/2022 DC2 | $30.00 |
DRYWALL RES 03/29/2022 DC2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $12.60 |
PERCENT CREDIT CARD FEE | $2.00 |
GAS RELEASE 05/23/2022 JWI | $30.00 |
GAS RELEASE 05/27/2022 JWI | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,411.96 |
RESIDENTIAL FEE | $121.59 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $263.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,254.00 |
AUTO PROCESSING FEE | $131.34 |
BRICKWALL TIES RES 04/18/2022 RWK | $30.00 |
ELECT FINAL RES 05/16/2022 RWK | $30.00 |
ELECT FINAL RES 05/20/2022 RWK | $30.00 |
UTILITIES INSPECTION 06/10/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 06/14/2022 TL | $100.00 |
Total Fees: | $8,580.29 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ METER PAYMENT |
______ REPL 1 PD METER |
______ REPL 2IN CMPND METER |
______ SET EFF 6 CMP METER |
______ SET EFF 4 CMP METER |
______ SET EFF 3 CMP METER |
______ SET EFF 2 CMP METER |
______ SET AFV 2 CMP METER |
______ REPL 3 AND 4 PD METER |
______ REPL 3IN CMPND METER |
______ REPL 6IN CMPND METER |
______ REPL 4IN CMPND METER |
______ REPL 5 AND 8 PD METER |
______ SET 8IN MACH 10 |
______ SET 6IN CMPND METER |
______ SET 4IN CMPND METER |
______ REPL AFV 2 CMP METER |
______ REPL EFF 2 CMP METER |
______ REPL EFF 3 CMP METER |
______ REPL EFF 4 CMP METER |
______ REPL EFF 6 CMP METER |
______ REPL HYDRANT REG |
______ SET 1 PD METER |
______ SET 12IN MACH 10 |
______ SET 2 CMPND METER |
______ SET 2 T-10 METER |
______ SET 3IN CMPND METER |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|