|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/21/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02701
|
JOB ADDRESS: 3379 MIDWICK DR FRISCO, TX 75034 |
DESC:
8231 AC, 10959 SF, 2 STORY |
|
OWNER:
LP GREAT KINGSWOOD LAND III
15400 KNOLL TRAIL DR STE 230 DALLAS TX 75248-7022
|
CONTRACTOR:
VCH CONSTRUCTION LP
17814 DAVENPORT RD STE 113 DALLAS TX 75252
|
ISSUED DATE: 6/21/2021
APPLIED DATE:6/18/2021
EXPIRED DATE:2/26/2025
SITE APN:ADD184232
STATUS:COMPLETED
|
|
APPLICANT:
Brooklyn Cueny
5208 Village Creek Dr. Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
REPLACEMENT CARD FEE | $10.00 |
2NDS AND FRAMING 05/24/2023 DW2 | $30.00 |
LATH RES 06/07/2023 DW2 | $30.00 |
LATH RES 06/14/2023 DW2 | $30.00 |
LATH RES 06/16/2023 DW2 | $30.00 |
LATH RES 06/22/2023 DW2 | $30.00 |
SLAB RES 04/05/2022 DWF | $30.00 |
SLAB RES 04/08/2022 DWF | $30.00 |
SHEATHING RES 11/10/2022 DWF | $30.00 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $11.50 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.60 |
FLATWORK RES 02/23/2024 GLQ | $30.00 |
PLUMB MECH FINAL 07/23/2024 JR2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $3,319.34 |
RESIDENTIAL FEE | $328.77 |
RESIDENTIAL MECHANICAL FEE | $225.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $455.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $2,177.00 |
AUTO PROCESSING FEE | $240.20 |
DRYWALL RES 07/06/2023 RWK | $30.00 |
GAS PRESSURE 01/03/2024 SDC | $30.00 |
GAS RELEASE 06/10/2024 SME2 | $30.00 |
PLUMB MECH FINAL 06/28/2024 SME2 | $30.00 |
PTO AND MECH ROUGH 04/04/2023 SMH | $30.00 |
PTO AND MECH ROUGH 04/20/2023 SMH | $30.00 |
UTILITIES INSPECTION 07/11/2024 TL | $100.00 |
UTILITIES INSPECTION 07/16/2024 TL | $100.00 |
Total Fees: | $13,846.61 |
|
|
| ______ T-POLE RES |
______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ RETAIN WALL RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH RES |
______ LATH RES |
______ INSULATION RES |
______ LATH RES |
______ LATH RES |
______ LATH RES |
______ LATH RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ 2NDS AND FRAMING |
______ GAS PRESSURE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|