|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/2/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02627
|
JOB ADDRESS: 8218 BENTHAVEN PL FRISCO, TX 75035 |
DESC:
4597 AC, 5678 SF, 2 STORY |
|
OWNER:
HOMES- EDGEWOOD SOUTHGATE
2805 DALLAS PKWY STE 120 PLANO TX 75093-8752
|
CONTRACTOR:
SOUTHGATE HOMES - EDGEWOOD, LLC
2805 Dallas Parkway, Suite 400 Plano TX 75093
|
ISSUED DATE: 7/2/2021
APPLIED DATE:5/18/2021
EXPIRED DATE:12/25/2022
SITE APN:ADD210907
STATUS:COMPLETED
|
|
APPLICANT:
Majo Wright
2805 DALLAS PARKWAY PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 07/30/2021 DOT | $30.00 |
2NDS AND FRAMING 01/31/2022 DWF | $30.00 |
INSULATION RES 02/11/2022 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $8.20 |
ELECT FINAL RES 04/25/2022 GLQ | $30.00 |
SET 1 PD METER 07/21/2021 JRC | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,911.62 |
RESIDENTIAL FEE | $170.34 |
RESIDENTIAL MECHANICAL FEE | $179.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $300.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $1,847.00 |
2NDS AND FRAMING 01/26/2022 PJF | $30.00 |
ELECT FINAL RES 04/06/2022 PJF | $30.00 |
UTILITIES INSPECTION 06/10/2022 TL | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
Total Fees: | $7,643.26 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ PLUMBING ROUGH-IN |
______ GAS PRESSURE |
______ PLUMBING ROUGH-IN |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|