Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/3/2021 PERMIT SUB-TYPE: SNEW PERMIT NO: B21-02330
JOB ADDRESS:
11651 BOND MEWS
FRISCO,
DESC:   2804 AC, 3475 SF, 2 STORY
OWNER:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400
PLANO TX 75093

CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400
PLANO TX 75093
ISSUED DATE:
5/3/2021
APPLIED DATE:
4/27/2021
EXPIRED DATE:
9/21/2022
SITE APN:
ADD236379
STATUS:
COMPLETED
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610
Dallas TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PTO AND MECH ROUGH 10/19/2021 CI$30.00
DRYWALL RES 12/29/2021 CMM2$30.00
INSULATION RES 12/07/2021 DWF$30.00
DRYWALL RES 12/23/2021 DWF$30.00
DRYWALL RES 01/03/2022 DWF$30.00
CREDIT CARD FEE$11.50
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.20
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,221.50
RESIDENTIAL FEE$104.25
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$235.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,174.00
AUTO PROCESSING FEE$124.90
SLAB RES 07/07/2021 PJF$30.00
2NDS AND FRAMING 11/04/2021 PJF$30.00
2NDS AND FRAMING 11/19/2021 PJF$30.00
Total Fees:$7,506.95
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  FLATWORK RES
______  GAS RELEASE
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)