|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/22/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02198
|
JOB ADDRESS: 16685 MAPLE BEND DR FRISCO, TX 75035 |
DESC:
3308 AC, 4005 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 2/22/2022
APPLIED DATE:4/22/2021
EXPIRED DATE:1/6/2024
SITE APN:ADD269969
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Jacobs
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 06/08/2023 CI | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
REPLACEMENT CARD FEE | $20.00 |
SLAB RES 08/26/2022 DW2 | $30.00 |
SLAB RES 08/29/2022 DW2 | $30.00 |
SLAB RES 09/07/2022 DW2 | $30.00 |
ELECT FINAL RES 04/19/2023 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $6.80 |
PERCENT CREDIT CARD FEE | $2.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 02/27/2023 GLQ | $30.00 |
REPLACE READABLE REGISTER | $310.00 |
SLAB RES 09/01/2022 JR2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,396.60 |
RESIDENTIAL FEE | $120.15 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
AUTO PROCESSING FEE | $178.54 |
2NDS AND FRAMING 02/28/2023 PJF | $30.00 |
2NDS AND FRAMING 03/06/2023 PJF | $30.00 |
2NDS AND FRAMING 03/07/2023 PJF | $30.00 |
2NDS AND FRAMING 03/09/2023 PJF | $30.00 |
PLUMB MECH FINAL 05/19/2023 SDC | $30.00 |
PTO AND MECH ROUGH 11/16/2022 SME2 | $30.00 |
PTO AND MECH ROUGH 12/22/2022 SMH | $30.00 |
PLUMB MECH FINAL 06/30/2023 SMH | $30.00 |
UTILITIES INSPECTION 06/05/2023 TL | $100.00 |
UTILITIES INSPECTION 06/13/2023 TL | $100.00 |
Total Fees: | $11,028.49 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ WATER REGISTER |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ 2NDS AND FRAMING |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|