|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/29/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02191
|
JOB ADDRESS: 11563 FRYER LN FRISCO, TX 75035 |
DESC:
3420 AC, 4011 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 12/29/2021
APPLIED DATE:12/29/2021
EXPIRED DATE:4/30/2024
SITE APN:ADD269933
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Jacobs
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
DRYWALL RES 04/04/2023 DWF | $30.00 |
CREDIT CARD FEE | $178.34 |
CREDIT CARD FEE | $11.70 |
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.20 |
PERCENT CREDIT CARD FEE | $0.80 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $10.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
REPLACEMENT CARD FEE | $10.00 |
PLUMB MECH FINAL 08/08/2023 JR2 | $30.00 |
SET 1 PD METER 03/31/2022 JRC | $100.00 |
PLUMBING ROUGH-IN 06/23/2022 JWI | $30.00 |
PTO AND MECH ROUGH 12/09/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,398.52 |
RESIDENTIAL FEE | $120.33 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $243.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
2NDS AND FRAMING 02/24/2023 PJF | $30.00 |
2NDS AND FRAMING 02/28/2023 PJF | $30.00 |
2NDS AND FRAMING 01/12/2023 RWT | $30.00 |
GAS RELEASE 06/01/2023 SDC | $30.00 |
PTO AND MECH ROUGH 11/08/2022 SME2 | $30.00 |
PTO AND MECH ROUGH 11/09/2022 SME2 | $30.00 |
PLUMB MECH FINAL 08/17/2023 SME2 | $30.00 |
PLUMB MECH FINAL 08/21/2023 SMH | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
Total Fees: | $11,089.29 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS PRESSURE |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ FLATWORK RES |
______ FLATWORK RES |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|