|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/26/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-02054
|
JOB ADDRESS: 10445 LAST STAND CIR FRISCO, TX 75035 |
DESC:
5082 AC , 6179 SF, 2 STORY |
|
OWNER:
PATRICK PAPAGOLOS
6904 HOMESTEAD DR MCKINNEY TX 75070-5459
|
CONTRACTOR:
HOME OWNER ACTING AS BUILDER
5225 Village Creek Dr suite 300 Plano TX 75093
|
ISSUED DATE: 4/26/2021
APPLIED DATE:4/26/2021
EXPIRED DATE:3/11/2023
SITE APN:ADD281838
STATUS:COMPLETED
|
|
APPLICANT:
Patrick Papagolos
5225 Village Creek Dr Suite 300 Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $11.50 |
2NDS AND FRAMING 01/25/2022 JDR | $30.00 |
2NDS AND FRAMING 01/31/2022 JDR | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $2,056.91 |
RESIDENTIAL FEE | $185.37 |
RESIDENTIAL MECHANICAL FEE | $185.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $322.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
AUTO PROCESSING FEE | $56.40 |
BRICKWALL TIES RES 02/02/2022 RWK | $30.00 |
2NDS AND FRAMING 02/02/2022 RWK | $30.00 |
UTILITIES INSPECTION 09/06/2022 TL | $100.00 |
Total Fees: | $3,993.08 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ BRICKWALL TIES RES |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ LATH RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|