|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/22/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-01887
|
JOB ADDRESS: 16429 SAGE CREST DR FRISCO, 75035 |
DESC:
3330 AC, 3910 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 4/22/2021
APPLIED DATE:4/19/2021
EXPIRED DATE:1/18/2023
SITE APN:ADD270245
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Jacobs
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
ELECT FINAL RES 06/13/2022 DC2 | $30.00 |
FLATWORK RES 06/17/2022 DC2 | $30.00 |
FLATWORK RES 06/21/2022 DC2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.40 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.80 |
2NDS AND FRAMING 02/09/2022 JDR | $30.00 |
2NDS AND FRAMING 02/15/2022 JDR | $30.00 |
PTO AND MECH ROUGH 01/14/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,365.30 |
RESIDENTIAL FEE | $117.30 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
AUTO PROCESSING FEE | $178.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 08/30/2021 PJF | $30.00 |
PLUMBING ROUGH-IN 07/15/2021 SDC | $30.00 |
PLUMBING ROUGH-IN 07/19/2021 SDC | $30.00 |
REPLACEMENT CARD FEE | $20.00 |
Total Fees: | $10,266.40 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|