BUILDING
Permit Payment Receipt
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/9/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-01700
|
JOB ADDRESS: 6134 BLYTHE DR FRISCO, TX 75035 |
DESC:
1715 AC, 2184 SF, 2 STORY |
|
OWNER:
GABLES LLC MEGATEL
2101 CEDAR SPRINGS RD STE 700 DALLAS TX 75201-1504
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 6/9/2021
APPLIED DATE:5/17/2021
EXPIRED DATE:10/30/2023
SITE APN:ADD159033
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 10/21/2022 CMM2 | $30.00 |
2NDS AND FRAMING 10/27/2022 CMM2 | $30.00 |
SHEATHING RES 11/23/2022 CMM2 | $30.00 |
INSULATION RES 12/21/2022 DC2 | $30.00 |
INSULATION RES 12/27/2022 DC2 | $30.00 |
INSULATION RES 12/29/2022 DC2 | $30.00 |
PLAN REVIEW FEE | $10.00 |
DRYWALL RES 01/11/2023 DW2 | $30.00 |
SLAB RES 09/09/2021 DWF | $30.00 |
CREDIT CARD FEE | $3.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $25.20 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SET 1 PD METER 07/06/2021 JRC | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 08/26/2022 MLM | $30.00 |
PTO AND MECH ROUGH 09/07/2022 SDC | $30.00 |
UTILITIES INSPECTION 04/04/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 04/10/2023 TL | $100.00 |
GAS RELEASE 03/20/2023 SME2 | $30.00 |
SLAB RES 09/20/2021 DW2 | $30.00 |
WATER IMPACT FEE | $1,939.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
RESIDENTIAL PLUMBING FEE | $205.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL FEE | $65.52 |
RESIDENTIAL NEW PERMIT FEE | $768.08 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $0.00 |
SLAB RES 09/10/2021 DW2 | $30.00 |
Total Fees: | $7,332.10 |
|
|
| ______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ MISC FRAME RES |
______ ELECT ROUGH RES |
______ MISC FRAME RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ WATER REGISTER |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ FLATWORK RES |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
|
|