|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/8/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-00959
|
JOB ADDRESS: 9560 WAKEFIELD ST FRISCO, 75035 |
DESC:
2640 AC, 3341 SF , 2 STORY |
|
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 3/8/2021
APPLIED DATE:3/4/2021
EXPIRED DATE:12/21/2022
SITE APN:ADD267459
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
GAS RELEASE 03/10/2022 DOT | $30.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $9.00 |
PERCENT CREDIT CARD FEE | $6.20 |
PERCENT CREDIT CARD FEE | $2.00 |
1 INCH PD METER | $450.00 |
REPLACE READABLE REGISTER | $310.00 |
2NDS AND FRAMING 01/07/2022 JDR | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 12/29/2021 MLM | $30.00 |
INSULATION RES 01/18/2022 RWK | $30.00 |
SLAB RES 09/03/2021 RWT | $30.00 |
SLAB RES 09/08/2021 RWT | $30.00 |
SLAB RES 09/13/2021 RWT | $30.00 |
PLUMBING ROUGH-IN 08/04/2021 SDC | $30.00 |
UTILITIES INSPECTION 06/16/2022 TL | $100.00 |
WATER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $2,344.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL FEE | $111.12 |
RESIDENTIAL NEW PERMIT FEE | $1,297.32 |
FENCE FEE | $20.00 |
Total Fees: | $6,193.94 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ REPL 1 PD METER |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|