|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/10/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-00479
|
JOB ADDRESS: 12909 SCISSORTAIL DR FRISCO, |
DESC:
3374 AC, 4024 SF, 2 STORY |
|
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 2/10/2021
APPLIED DATE:2/10/2021
EXPIRED DATE:7/27/2022
SITE APN:ADD235358
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 09/15/2021 DC2 | $30.00 |
2NDS AND FRAMING 09/22/2021 DC2 | $30.00 |
ELECT FINAL RES 12/23/2021 DWF | $30.00 |
ELECT FINAL RES 01/14/2022 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $2.00 |
DRYWALL RES 10/28/2021 JDW2 | $30.00 |
PTO AND MECH ROUGH 09/03/2021 JWE2 | $30.00 |
PTO AND MECH ROUGH 09/10/2021 JWE2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 01/21/2022 NMN | $100.00 |
UTILITIES INSPECTION 01/26/2022 NMN | $100.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,402.68 |
RESIDENTIAL FEE | $120.72 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $249.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,174.00 |
AUTO PROCESSING FEE | $129.13 |
DRYWALL RES 11/01/2021 PJF | $30.00 |
GAS RELEASE 01/14/2022 SMH | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
Total Fees: | $7,967.63 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|