BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/3/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-00232
|
JOB ADDRESS: 2580 MAIDENHAIR RD FRISCO, TX 75033 |
DESC:
3757 AC, 4671 SF, 2 STORY |
|
OWNER:
NASH ELAND LLC
4790 EASTGATE MALL #150 SAN DIEGO CA 92121-1970
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 2/3/2021
APPLIED DATE:2/3/2021
EXPIRED DATE:3/29/2022
SITE APN:ADD208750
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PTO AND MECH ROUGH 06/24/2021 AMM2 | $30.00 |
PTO AND MECH ROUGH 07/02/2021 AMM2 | $30.00 |
2NDS AND FRAMING 07/20/2021 BC | $30.00 |
2NDS AND FRAMING 07/22/2021 BC | $30.00 |
2NDS AND FRAMING 07/23/2021 BC | $30.00 |
GAS RELEASE 09/16/2021 CI | $30.00 |
OVERPAID TAP FEE | $100.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $12.00 |
SET 1 PD METER 09/24/2021 JRC | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 07/07/2021 MLM | $30.00 |
AUTO PROCESSING FEE | $85.77 |
2NDS AND FRAMING 07/26/2021 RWT | $30.00 |
WATER IMPACT FEE | $464.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
RESIDENTIAL PLUMBING FEE | $285.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL FEE | $140.13 |
RESIDENTIAL NEW PERMIT FEE | $1,608.01 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
CREDIT CARD FEE | $1.20 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 09/27/2021 NMN | $100.00 |
CREDIT CARD FEE | $2.00 |
Total Fees: | $6,125.71 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ TREE |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|