BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/5/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-05985
|
JOB ADDRESS: 12515 WINELANDS CT FRISCO, TX 75033 |
DESC:
5322 AC, 9054 SF, 2 STORY |
|
OWNER:
NEWMAN DEVELOPMENT LTD
9801 CAMFIELD AVE FRISCO TX 75033-2506
|
CONTRACTOR:
PREMIER RENOVATIONS INC
17818 DAVENPORT RD STE 116 DALLAS TX 75252
|
ISSUED DATE: 2/5/2021
APPLIED DATE:1/22/2021
EXPIRED DATE:3/14/2023
SITE APN:ADD143211
STATUS:COMPLETED
|
|
APPLICANT:
Ron Davis
17818 Davenport Rd Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING RES 07/19/2021 BC | $30.00 |
2NDS AND FRAMING 11/12/2021 BC | $30.00 |
BRICKWALL TIES RES 01/03/2022 BC | $30.00 |
BRICKWALL TIES RES 01/17/2022 BC | $30.00 |
FLATWORK RES 06/30/2022 CAB | $30.00 |
GAS RELEASE 06/01/2022 CI | $30.00 |
GAS RELEASE 06/10/2022 CI | $30.00 |
GAS RELEASE 06/23/2022 CI | $30.00 |
PLAN REVIEW FEE | $50.00 |
BRICKWALL TIES RES 01/12/2022 DW2 | $30.00 |
2NDS AND FRAMING 11/02/2021 DWF | $30.00 |
2NDS AND FRAMING 11/09/2021 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $10.60 |
SLAB RES 05/03/2021 GLQ | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
GAS RELEASE 05/24/2022 JWI | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $2,824.04 |
RESIDENTIAL FEE | $271.62 |
RESIDENTIAL MECHANICAL FEE | $185.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $350.00 |
SEWER IMPACT FEE | $2,294.00 |
THOROUGHFARE IMPACT FEE | $5,322.00 |
WATER IMPACT FEE | $2,823.00 |
AUTO PROCESSING FEE | $282.80 |
ELECT RELEASE RES 06/20/2022 RWT | $30.00 |
ELECT RELEASE RES 06/23/2022 RWT | $30.00 |
PLUMBING ROUGH-IN 03/31/2021 SDC | $30.00 |
PLUMB MECH FINAL 08/25/2022 SMH | $30.00 |
Total Fees: | $16,345.66 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ ELECT ROUGH RES |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ LATH RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT RELEASE RES |
______ ELECT RELEASE RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ MECHANICAL FINAL |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ ELECT FINAL RES |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|