|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/9/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-05325
|
JOB ADDRESS: 214 TIMBER CREEK LN FRISCO, TX 75068 |
DESC:
3192 AC, 3960 SF, 2 STORY |
|
OWNER:
LENNAR HOMES OF TEXAS INC
1707 MARKET PL STE 250 IRVING TX 75063-8050
|
CONTRACTOR:
LENNAR HOMES
1707 MARKETPLACE BLVD, STE. 100 IRVING TX 75063
|
ISSUED DATE: 12/9/2020
APPLIED DATE:12/9/2020
EXPIRED DATE:5/23/2022
SITE APN:ADD151072
STATUS:COMPLETED
|
|
APPLICANT:
Priscilla Bates
1707 Marketplace Blvd #100 Irving TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PTO AND MECH ROUGH 06/08/2021 AMM2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
GAS RELEASE 09/21/2021 CI | $30.00 |
DRYWALL RES 07/16/2021 DC2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $15.80 |
CREDIT CARD FEE | $1.20 |
ELECT FINAL RES 09/13/2021 GLQ | $30.00 |
PLUMBING ROUGH-IN 01/05/2021 MLM | $30.00 |
PLUMBING ROUGH-IN 01/08/2021 MLM | $30.00 |
UTILITIES INSPECTION 11/15/2021 NMN | $100.00 |
UTILITIES INSPECTION 11/16/2021 NMN | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,381.80 |
RESIDENTIAL FEE | $118.80 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $264.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,113.00 |
AUTO PROCESSING FEE | $81.00 |
2NDS AND FRAMING 06/17/2021 REED | $30.00 |
2NDS AND FRAMING 06/22/2021 RWT | $30.00 |
2NDS AND FRAMING 06/24/2021 RWT | $30.00 |
DRYWALL RES 07/20/2021 RWT | $30.00 |
PTO AND MECH ROUGH 04/09/2021 SDC | $30.00 |
PTO AND MECH ROUGH 04/28/2021 SDC | $30.00 |
PLUMB MECH FINAL 11/17/2021 SMH | $30.00 |
PLUMB MECH FINAL 11/19/2021 SMH | $30.00 |
Total Fees: | $6,166.00 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ GAS PRESSURE |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|