APPROVED DATE: 12/8/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-05151
|
JOB ADDRESS: 9759 STRATTON DR FRISCO, TX 75035 |
DESC:
1963 AC, 2454 SF, 1 STORY |
|
OWNER:
MEGATEL HOMES INC
DALLAS TX 75201-1504
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 12/8/2020
APPLIED DATE:12/4/2020
EXPIRED DATE:4/25/2022
SITE APN:ADD167441
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.20 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
UTILITIES INSPECTION 09/30/2021 NMN | $100.00 |
UTILITIES INSPECTION 10/07/2021 NMN | $100.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $867.98 |
RESIDENTIAL FEE | $73.62 |
RESIDENTIAL MECHANICAL FEE | $113.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $212.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
PLAN REVIEW FEE | $50.00 |
ELECT FINAL RES 09/21/2021 RWT | $30.00 |
PTO AND MECH ROUGH 05/25/2021 SDC | $30.00 |
PTO AND MECH ROUGH 05/04/2021 SMH | $30.00 |
PTO AND MECH ROUGH 05/17/2021 SMH | $30.00 |
Total Fees: | $4,151.80 |
|
|
| ______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ TREE |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|