|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/4/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-05108
|
JOB ADDRESS: 9705 STRATTON DR FRISCO, TX 75035 |
DESC:
2547 AC, 3175 SF, 2 STORY |
|
OWNER:
MEGATEL HOMES LLC
DALLAS TX 75201-1504
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 12/4/2020
APPLIED DATE:12/3/2020
EXPIRED DATE:2/20/2022
SITE APN:ADD167438
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 03/23/2021 CCM | $30.00 |
2NDS AND FRAMING 03/26/2021 CCM | $30.00 |
DRYWALL RES 04/22/2021 DW2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
ELECT FINAL RES 06/15/2021 MS2 | $30.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,119.50 |
RESIDENTIAL FEE | $95.25 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $243.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
Total Fees: | $4,237.75 |
|
|
| ______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|