Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/30/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-04980
JOB ADDRESS:
13182 JUILLIARD ST
FRISCO, TX 75035
DESC:   3349 AC, 3907 SF, 2 STORY
OWNER:
EDGEWOOD LLC GRBK
2805 DALLAS PKWY STE 400
PLANO TX 75093-8722

CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460
PLANO TX 75093
ISSUED DATE:
11/30/2020
APPLIED DATE:
11/24/2020
EXPIRED DATE:
11/23/2021
SITE APN:
ADD214767
STATUS:
COMPLETED
APPLICANT:
Tracy Cooper
2400 Dallas Parkway
Plano TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$2.40
CREDIT CARD FEE$3.60
CREDIT CARD FEE$0.60
SLAB RES 12/17/2020 GLQ$30.00
SHEATHING RES 03/05/2021 JDR$30.00
PLUMB MECH FINAL 05/24/2021 MLM$30.00
UTILITIES INSPECTION 04/29/2021 NMN$90.00
UTILITIES INSPECTION 05/03/2021 NMN$90.00
AUTO PROCESSING FEE$0.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,364.31
RESIDENTIAL FEE$117.21
RESIDENTIAL MECHANICAL FEE$133.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$228.00
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$1,847.00
2NDS AND FRAMING 03/10/2021 REED$30.00
PTO AND MECH ROUGH 02/03/2021 SMH$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
Total Fees:$6,540.12
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)