|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/12/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-04693
|
JOB ADDRESS: 7958 MONKS CAP ST FRISCO, TX 75035 |
DESC:
4320 AC, 5096 SF, 2 STORY |
|
|
CONTRACTOR:
AMERICAN LEGEND HOMES
4400 STATE HWY 121, SUITE 410 LEWISVILLE, TX 75056 LEWISVILLE TX 75056
|
ISSUED DATE: 11/12/2020
APPLIED DATE:11/4/2020
EXPIRED DATE:11/7/2021
SITE APN:ADD216414
STATUS:COMPLETED
|
|
APPLICANT:
Liliana Moton
4400 State Highway 121 Lewisville TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 01/06/2021 CI | $30.00 |
CREDIT CARD FEE | $1.80 |
SLAB RES 11/30/2020 MS2 | $30.00 |
2NDS AND FRAMING 01/21/2021 MS2 | $30.00 |
UTILITIES INSPECTION 05/05/2021 NMN | $90.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,738.80 |
RESIDENTIAL FEE | $152.88 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $270.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $950.00 |
WATER IMPACT FEE | $1,811.00 |
Total Fees: | $7,776.98 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|