|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/5/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-04676
|
JOB ADDRESS: 11334 FOUR ROSES TRL FRISCO, TX 75035 |
DESC:
39654 AC, 4645 SF, 2 STORY |
|
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 11/5/2020
APPLIED DATE:11/5/2020
EXPIRED DATE:3/7/2022
SITE APN:ADD236078
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 05/26/2021 CCM | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $3.20 |
CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $2.00 |
PLUMB MECH FINAL 08/25/2021 JWE2 | $30.00 |
SET 1 PD METER 11/24/2020 JCM | $80.00 |
PLAN REVIEW FEE | $50.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
UTILITIES INSPECTION 08/26/2021 NMN | $100.00 |
UTILITIES INSPECTION 08/27/2021 NMN | $100.00 |
UTILITIES INSPECTION 08/31/2021 NMN | $100.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,599.95 |
RESIDENTIAL FEE | $139.35 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,174.00 |
AUTO PROCESSING FEE | $133.59 |
AUTO PROCESSING FEE | $1.00 |
ELECT FINAL RES 08/11/2021 PJF | $30.00 |
PLUMBING ROUGH-IN 12/14/2020 SMH | $30.00 |
PLUMBING ROUGH-IN 01/20/2021 SMH | $30.00 |
Total Fees: | $8,296.99 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|