Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/27/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-04567
JOB ADDRESS:
13152 SECRETARIAT BLVD
FRISCO, TX 75035
DESC:   5131 AC, 6210 SF, 2 STORY
OWNER:
DALLAS TX LLC TOLL
250 GIBRALTAR RD
HORSHAM PA 19044-2323

CONTRACTOR:
TOLL BROTHERS INC (GEN)
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034
ISSUED DATE:
10/27/2020
APPLIED DATE:
10/27/2020
EXPIRED DATE:
4/18/2022
SITE APN:
ADD160698
STATUS:
COMPLETED
APPLICANT:
Lori Shaak
2555 SW Grapevine Parkway #100
Grapevine TX 76051
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$2.40
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
WATER IMPACT FEE$2,441.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$1,619.00
RESIDENTIAL PLUMBING FEE$335.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL MECHANICAL FEE$192.00
RESIDENTIAL FEE$186.30
RESIDENTIAL NEW PERMIT FEE$2,065.90
FENCE FEE$20.00
AUTO PROCESSING FEE$6.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$11.50
SHEATHING RES 04/05/2021 DWF$30.00
INSULATION RES 07/13/2021 DW2$30.00
FLATWORK RES 08/16/2021 DC2$30.00
2NDS AND FRAMING 05/10/2021 CCM$30.00
ELECT ROUGH RES 04/30/2021 CCM$30.00
2NDS AND FRAMING 04/30/2021 CCM$30.00
AUTO PROCESSING FEE$137.18
Total Fees:$8,072.48
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  ELECT ROUGH RES
______  2NDS AND FRAMING
______  ELECT ROUGH RES
______  2NDS AND FRAMING
______  ELECT ROUGH RES
______  2NDS AND FRAMING
______  ELECT ROUGH RES
______  2NDS AND FRAMING
______  LATH RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  TREE
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)