|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/21/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-04335
|
JOB ADDRESS: 15872 TEA TREE RD FRISCO, TX 75033 |
DESC:
2720 AC, 3564 SF, 1 STORY |
|
OWNER:
NASH ELAND LLC
4790 EASTGATE MALL #150 SAN DIEGO CA 92121-1970
|
CONTRACTOR:
CHESMAR HOMES, LLC
1600 N COLINS STE., 1400 RICHARDSON TX 75080
|
ISSUED DATE: 10/21/2020
APPLIED DATE:10/20/2020
EXPIRED DATE:12/14/2021
SITE APN:ADD207536
STATUS:COMPLETED
|
|
APPLICANT:
Matt Badgett
1600 N. Collins Suite 1400 Richardson TX 75080
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 12/04/2020 ARG | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $11.80 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 01/29/2021 MLM | $30.00 |
UTILITIES INSPECTION 06/03/2021 NMN | $90.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,251.12 |
RESIDENTIAL FEE | $106.92 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $221.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $528.00 |
AUTO PROCESSING FEE | $77.71 |
PLUMBING ROUGH-IN 11/17/2020 SMH | $30.00 |
Total Fees: | $5,549.35 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|