|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/13/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-04295
|
JOB ADDRESS: 2404 MAIDENHAIR RD FRISCO, TX 75033 |
DESC:
2201 AC, 2870 SF, 1 STORY |
|
OWNER:
NASH ELAND LLC
4790 EASTGATE MALL #150 SAN DIEGO CA 92121-1970
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 10/13/2020
APPLIED DATE:10/13/2020
EXPIRED DATE:12/14/2021
SITE APN:ADD208739
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
FLATWORK RES 04/19/2021 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $4.60 |
UTILITIES INSPECTION 06/08/2021 NMN | $90.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,014.50 |
RESIDENTIAL FEE | $86.10 |
RESIDENTIAL MECHANICAL FEE | $133.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $191.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $464.00 |
AUTO PROCESSING FEE | $70.55 |
SET 1 PD METER 10/28/2020 EMS | $80.00 |
GAS RELEASE 05/10/2021 SDC | $30.00 |
Total Fees: | $4,725.25 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|