|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/19/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-04035
|
JOB ADDRESS: 12807 LEOPOLD TRL FRISCO, 75035 |
DESC:
1801 AC, 2362 SF, 2 STORY |
|
OWNER:
EDGEWOOD LLC GRBK
2805 DALLAS PKWY STE 400 PLANO TX 75093-8722
|
CONTRACTOR:
CB JENI 2020 LLC
2805 Dallas Pkwy Plano TX 75093
|
ISSUED DATE: 10/19/2020
APPLIED DATE:9/16/2020
EXPIRED DATE:10/13/2021
SITE APN:ADD235418
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Graves
2805 Dallas Pkwy Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 01/11/2021 ARG | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $11.80 |
GAS RELEASE 03/10/2021 MLM | $30.00 |
UTILITIES INSPECTION 04/06/2021 NMN | $90.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $833.94 |
RESIDENTIAL FEE | $70.86 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $205.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,174.00 |
PTO AND MECH ROUGH 01/06/2021 SMH | $30.00 |
Total Fees: | $7,328.90 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ TREE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|