Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/1/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-03339
JOB ADDRESS:
7826 GLASTONBURY DR
FRISCO, TX 75035
DESC:   1872 AC, 2378 SF, 1 STORY
OWNER:
EDGEWOOD LLC GRBK
2805 DALLAS PKWY STE 400
PLANO TX 75093-8722

CONTRACTOR:
NORMANDY HOMES EDGEWOOD, LLC
2805 DALLAS PKWY, STE. 400
PLANO TX 75093
ISSUED DATE:
9/1/2020
APPLIED DATE:
8/10/2020
EXPIRED DATE:
2/28/2021
SITE APN:
C2782757
STATUS:
EXPIRED
APPLICANT:
Melissa Graves
2805 Dallas Pkwy
Plano TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
PLUMB MECH FINAL 01/26/2021 DOT$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.80
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
ELECT FINAL RES 12/30/2020 GLQ$30.00
CO AND BUILD FINAL 02/10/2021 JDR$30.00
FLATWORK RES 12/21/2020 MC$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$802.86
RESIDENTIAL FEE$68.34
RESIDENTIAL MECHANICAL FEE$113.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$212.00
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$1,847.00
2NDS AND FRAMING 11/10/2020 REED$30.00
SHEATHING RES 11/04/2020 RWT$30.00
2NDS AND FRAMING 11/12/2020 RWT$30.00
PLUMBING ROUGH-IN 09/17/2020 MLM$30.00
Total Fees:$5,808.00
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  BRICKWALL TIES RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)