|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/13/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-03293
|
JOB ADDRESS: 16174 DOE LAKE DR FRISCO, TX 75068 |
DESC:
2058 AC, 2524 SF, 2 STORY |
|
OWNER:
DOE CREEK VENTURES LLC
4204 N INTERSTATE 35 DENTON TX 76207-3441
|
CONTRACTOR:
DOE CREEK VENTURES, LLC
4204 NORTH I-35 DENTON TX 76207
|
ISSUED DATE: 11/13/2020
APPLIED DATE:11/4/2020
EXPIRED DATE:9/13/2023
SITE APN:D731735
STATUS:COMPLETED
|
|
APPLICANT:
Ravi Durairaj
8001 PULLAM CIR PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 07/12/2022 CAB | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
FIRE RATED WALL RES 04/26/2022 DW2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.61 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.00 |
REPLACEMENT CARD FEE | $10.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $893.40 |
RESIDENTIAL FEE | $75.72 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $205.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $2,735.00 |
WATER IMPACT FEE | $1,836.00 |
ELECT FINAL RES 11/16/2022 PJF | $30.00 |
FIRE RATED WALL RES 06/08/2022 RWK | $30.00 |
FIRE RATED WALL RES 06/10/2022 RWK | $30.00 |
FIRE RATED WALL RES 06/16/2022 RWK | $30.00 |
2NDS AND FRAMING 07/06/2022 RWK | $30.00 |
2NDS AND FRAMING 07/07/2022 RWK | $30.00 |
2NDS AND FRAMING 07/13/2022 RWK | $30.00 |
DRYWALL RES 07/26/2022 RWK | $30.00 |
SLAB RES 05/28/2021 RWT | $30.00 |
T-POLE RES 06/04/2021 RWT | $30.00 |
PLUMBING ROUGH-IN 04/22/2021 SDC | $30.00 |
PLUMBING ROUGH-IN 04/23/2021 SDC | $30.00 |
PTO AND MECH ROUGH 04/06/2022 SDC | $30.00 |
PTO AND MECH ROUGH 05/25/2022 SDC | $30.00 |
PLUMB MECH FINAL 02/10/2023 SDC | $30.00 |
PLUMB MECH FINAL 02/13/2023 SDC | $30.00 |
UTILITIES INSPECTION 01/18/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 03/06/2023 TL | $100.00 |
Total Fees: | $9,673.13 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ T-POLE RES |
______ T-POLE RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|