|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/17/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02902
|
JOB ADDRESS: 215 TIMBER CREEK LN FRISCO, TX 75068 |
DESC:
3205 AC, 4091 SF, 2 STORY |
|
OWNER:
MASTER DEVELOPERS-TCB2 LLC
2400 DALLAS PKWY STE 560 PLANO TX 75093-4381
|
CONTRACTOR:
UNION MAIN HOMES
5005 LBJ FWY SUITE 350 DALLAS TX 75244
|
ISSUED DATE: 8/17/2020
APPLIED DATE:7/17/2020
EXPIRED DATE:9/19/2021
SITE APN:D684143
STATUS:COMPLETED
|
|
APPLICANT:
JORGE TORRES
5005 LBJ Freeway, Ste 350 Dallas TX 75244
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.80 |
SLAB RES 09/18/2020 GLQ | $30.00 |
SLAB RES 09/21/2020 GLQ | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 11/17/2020 MS2 | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,295.67 |
RESIDENTIAL FEE | $110.97 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $10.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,113.00 |
PLAN REVIEW FEE | $50.00 |
PTO AND MECH ROUGH 11/11/2020 SMH | $0.00 |
Total Fees: | $4,960.44 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ TREE |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|