|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/27/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02643
|
JOB ADDRESS: 13336 RIVERHILL RD FRISCO, TX 75033 |
DESC:
4433 AC, 5463 SF, 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
2500 LEGACY DR STE 100 FRISCO TX 75034-5984
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
6735 SALT CEDAR WAY, BLDG 1, STE 200 FRISCO TX 75034
|
ISSUED DATE: 7/27/2020
APPLIED DATE:7/2/2020
EXPIRED DATE:1/23/2021
SITE APN:D693711
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
6735 SALT CEDAR WAY, BLDG 1, STE 200 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 11/19/2020 ARG | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
CREDIT CARD FEE | $1.20 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,848.90 |
RESIDENTIAL FEE | $163.89 |
RESIDENTIAL MECHANICAL FEE | $185.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $300.00 |
SEWER IMPACT FEE | $2,294.00 |
THOROUGHFARE IMPACT FEE | $5,322.00 |
WATER IMPACT FEE | $3,250.00 |
GAS RELEASE 02/24/2021 SDC | $30.00 |
Total Fees: | $14,320.49 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ LATH RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ TREE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|