|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/20/2020
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B20-02517
|
JOB ADDRESS: 6990 MAIN ST 300 C FRISCO, TX 75033 |
DESC:
3328 SF, YOGA STUDIO |
|
OWNER:
NACK INVESTMENTS LLC 4278
3680 CORKWOOD DR FRISCO TX 75033-1385
|
CONTRACTOR:
JT Construction
1903 Windchime Dr Dallas TX 75224
|
ISSUED DATE: 8/20/2020
APPLIED DATE:6/25/2020
EXPIRED DATE:7/24/2021
SITE APN:C946089
STATUS:COMPLETED
|
|
APPLICANT:
Cameron Culver
901 N. McDonald Street Suite 203 McKinney TX 75069
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 85000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2 INCH WATER TAP 8-12 IN PIPE | $0.00 |
CREDIT CARD FEE | $0.70 |
CREDIT CARD FEE | $1.40 |
CREDIT CARD FEE | $90.94 |
CREDIT CARD FEE | $1.60 |
SET 2 T-10 METER 01/07/2021 JCM | $80.00 |
2 INCH T-10 METER | $825.00 |
2 INCH WATER TAP 8-12 IN PIPE | $2,597.03 |
WATER METER DEPOSIT COMMERCIAL | $1,125.00 |
AUTO PROCESSING FEE | $3.00 |
COMMERCIAL FEE | $163.12 |
COMMERCIAL MECHANICAL FEE | $196.40 |
COMMERCIAL PLUMBING FEE | $329.52 |
COMMERCIAL RENOVATION APPLICATION FEE | $150.00 |
COMMERCIAL RENOVATION FEE | $383.25 |
AUTO PROCESSING FEE | $21.45 |
SLAB COMM 10/30/2020 REED | $35.00 |
INSULATION COMM 11/24/2020 REED | $35.00 |
INSULATION COMM 11/25/2020 REED | $35.00 |
Total Fees: | $6,073.41 |
|
|
| ______ ELECT ROUGH COMM |
______ ELECT RELEASE COMM |
______ PLUMBING ROUGH-IN |
______ SLAB COMM |
______ SLAB COMM |
______ SLAB COMM |
______ CEILING |
______ INSULATION COMM |
______ INSULATION COMM |
______ INSULATION COMM |
______ ELECT FINAL COMM |
______ INSULATION COMM |
______ DRYWALL COMM |
______ PLUMBING ROUGH-IN |
______ DRYWALL COMM |
______ METER PAYMENT |
______ SET 2 T-10 METER |
______ ELECT FINAL COMM |
______ PLUMBING FINAL |
______ FIRE FINAL |
______ ELECT FINAL COMM |
______ GAS PRESSURE |
______ SET 2 T-10 METER |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|