|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/17/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02507
|
JOB ADDRESS: 9754 STAFFORDSHIRE RD FRISCO, TX 75035 |
DESC:
1800 AC, 2335 SF, 2 STORY |
|
OWNER:
HOMES INC MEGATEL
1800 VALLEY VIEW LN STE 400 DALLAS TX 75234-8923
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 7/17/2020
APPLIED DATE:6/24/2020
EXPIRED DATE:1/13/2021
SITE APN:C2741139
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 11/06/2020 JDW2 | $30.00 |
2NDS AND FRAMING 11/18/2020 JDW2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $823.95 |
RESIDENTIAL FEE | $70.05 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $191.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 08/21/2020 WND | $30.00 |
Total Fees: | $3,845.50 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ FLATWORK RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|