|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/13/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02427
|
JOB ADDRESS: 2494 BUNNELS FORK RD FRISCO, TX 75036 |
DESC:
4472 AC, 5800 SF, 2 STORY |
|
OWNER:
CALATLANTIC HOMES OF TEXAS INC
1707 MARKET PL STE 100 IRVING TX 75063-8050
|
CONTRACTOR:
LENNAR HOMES
1707 MARKETPLACE BLVD, STE. 100 IRVING TX 75063
|
ISSUED DATE: 8/13/2020
APPLIED DATE:6/22/2020
EXPIRED DATE:12/20/2021
SITE APN:D701893
STATUS:COMPLETED
|
|
APPLICANT:
Priscilla Bates
1707 Marketplace Blvd #100 Irving TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PTO AND MECH ROUGH 01/08/2021 AMM2 | $30.00 |
PTO AND MECH ROUGH 01/14/2021 AMM2 | $30.00 |
PLAN REVIEW FEE | $100.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $4.20 |
ELECT FINAL RES 04/15/2021 GLQ | $30.00 |
FLATWORK RES 05/05/2021 GLQ | $30.00 |
2NDS AND FRAMING 01/22/2021 MS2 | $30.00 |
UTILITIES INSPECTION 06/10/2021 NMN | $90.00 |
UTILITIES INSPECTION 06/16/2021 NMN | $90.00 |
UTILITIES INSPECTION 06/18/2021 NMN | $90.00 |
AUTO PROCESSING FEE | $165.27 |
PLUMB MECH FINAL 06/11/2021 SMH | $30.00 |
PLUMB MECH FINAL 06/17/2021 SMH | $30.00 |
SLAB RES 10/16/2020 VCS | $30.00 |
PTO AND MECH ROUGH 01/19/2021 SDC | $30.00 |
WATER IMPACT FEE | $1,772.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
SEWER IMPACT FEE | $0.00 |
RESIDENTIAL PLUMBING FEE | $312.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL FEE | $171.21 |
RESIDENTIAL NEW PERMIT FEE | $1,920.03 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
ELECT FINAL RES 04/19/2021 DW2 | $30.00 |
Total Fees: | $9,902.91 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|