|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/22/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02266
|
JOB ADDRESS: 12979 SHEPHERDS HILL LN FRISCO, TX 75035 |
DESC:
2915 AC, 3568 SF, 2 STORY |
|
OWNER:
EDGEWOOD LLC GRBK
2805 DALLAS PKWY STE 400 PLANO TX 75093-8722
|
CONTRACTOR:
NORMANDY HOMES EDGEWOOD, LLC
2805 DALLAS PKWY, STE. 400 PLANO TX 75093
|
ISSUED DATE: 6/22/2020
APPLIED DATE:6/12/2020
EXPIRED DATE:6/27/2021
SITE APN:C2782622
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Graves
2805 Dallas Pkwy Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 07/22/2020 ARG | $30.00 |
SLAB RES 07/31/2020 ARG | $30.00 |
2NDS AND FRAMING 09/22/2020 ARG | $30.00 |
CREDIT CARD FEE | $6.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CO AND BUILD FINAL 12/28/2020 GLQ | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 09/17/2020 MLM | $30.00 |
UTILITIES INSPECTION 12/14/2020 NMN | $90.00 |
AUTO PROCESSING FEE | $118.04 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,332.30 |
RESIDENTIAL FEE | $114.30 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $1,847.00 |
PTO AND MECH ROUGH 09/16/2020 SDC | $30.00 |
DRYWALL RES 10/02/2020 VCS | $30.00 |
SHEATHING RES 08/28/2020 WND | $30.00 |
Total Fees: | $7,249.24 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|