|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/4/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-02006
|
JOB ADDRESS: 8280 GLASTONBURY DR FRISCO, TX 75035 |
DESC:
3508 AC, 4371 SF, 2 STORY |
|
OWNER:
TSHH LLC
PLANO TX 75093-8752
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 6/5/2020
APPLIED DATE:6/2/2020
EXPIRED DATE:5/19/2021
SITE APN:C2782709
STATUS:COMPLETED
|
|
APPLICANT:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 07/14/2020 ARG | $30.00 |
2NDS AND FRAMING 08/20/2020 ARG | $30.00 |
2NDS AND FRAMING 08/25/2020 ARG | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,513.72 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL FEE | $131.13 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
WATER IMPACT FEE | $1,847.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMB MECH FINAL 11/17/2020 DOT | $30.00 |
CREDIT CARD FEE | $6.00 |
CREDIT CARD FEE | $110.38 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $2.80 |
CREDIT CARD FEE | $3.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 07/02/2020 MXH | $80.00 |
UTILITIES INSPECTION 11/09/2020 NMN | $90.00 |
Total Fees: | $6,827.73 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ TREE |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|