Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/23/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-01985
JOB ADDRESS:
2089 SNAPDRAGON RD
FRISCO, TX 75033
DESC:   4083 AC, 5042 SF , 2 STORY
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC
SAN DIEGO CA 92121-1970

CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400
PLANO TX 75093
ISSUED DATE:
6/24/2020
APPLIED DATE:
6/1/2020
EXPIRED DATE:
7/25/2021
SITE APN:
D695921
STATUS:
COMPLETED
APPLICANT:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
AUTO PROCESSING FEE$0.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,722.60
RESIDENTIAL FEE$151.26
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$256.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$635.00
SEWER IMPACT FEE$1,619.00
CREDIT CARD FEE$6.00
CREDIT CARD FEE$92.00
CREDIT CARD FEE$11.50
CREDIT CARD FEE$1.20
CREDIT CARD FEE$7.80
2NDS AND FRAMING 09/18/2020 JDR$30.00
2NDS AND FRAMING 09/14/2020 JDW2$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
UTILITIES INSPECTION 01/15/2021 NMN$90.00
REPLACE READABLE REGISTER$300.00
PLAN REVIEW FEE$50.00
Total Fees:$6,043.36
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  2NDS AND FRAMING
______  DRYWALL RES
______  GAS RELEASE
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  FLATWORK RES
______  UTILITIES INSPECTION
______  WATER REGISTER
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)