Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/9/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-01968
JOB ADDRESS:
4059 STARLING DR
FRISCO, TX 75034
DESC:   7454 AC, 10855 SF , 2 STORY
OWNER:
STEVENS, EARL

DANVILLE CA 94506-1189

CONTRACTOR:
J ANTHONY CUSTOM HOMES LLC
1680 JAN MARIE DRIVE
LUCAS TX 75002
ISSUED DATE:
6/10/2020
APPLIED DATE:
5/28/2020
EXPIRED DATE:
10/24/2023
SITE APN:
D611640
STATUS:
COMPLETED
APPLICANT:
RESCOM FIRE SYSTEMS
PO BOX 630886
IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
FLATWORK RES 03/28/2023 DC2$30.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$0.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL FEE$231.09
RESIDENTIAL MECHANICAL FEE$198.50
RESIDENTIAL PLUMBING FEE$371.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
2NDS AND FRAMING 10/25/2021 DW2$30.00
2NDS AND FRAMING 10/28/2021 DW2$30.00
2NDS AND FRAMING 11/01/2021 DW2$30.00
2NDS AND FRAMING 11/05/2021 DW2$30.00
2NDS AND FRAMING 11/17/2021 DW2$30.00
CREDIT CARD FEE$22.41
CREDIT CARD FEE$11.50
CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$10.00
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
PTO AND MECH ROUGH 08/19/2021 MLM$30.00
BRICKWALL TIES RES 12/07/2021 RWT$30.00
LATH RES 12/14/2021 RWT$30.00
DRYWALL RES 01/07/2022 RWT$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
PLAN REVIEW FEE$50.00
FLATWORK RES 08/16/2022 RWT$30.00
FIRE DEPT INSPECTION FEES$223.62
ELECT FINAL RES 07/18/2022 GLQ$30.00
ELECT FINAL RES 07/12/2022 GLQ$30.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$2.44
PERCENT CREDIT CARD FEE$1.80
CREDIT CARD FEE$2.40
FLATWORK RES 04/17/2023 DW2$30.00
PTO AND MECH ROUGH 10/20/2021 DOT$30.00
PTO AND MECH ROUGH 10/13/2021 DOT$30.00
CO AND BUILD FINAL 03/21/2023 DC2$30.00
CREDIT CARD FEE$5.47
Total Fees:$3,040.63
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  SHEATHING RES
______  AUTOFIRE SPRK HYDRO
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  LATH RES
______  BRICKWALL TIES RES
______  LATH RES
______  LATH RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  GAS RELEASE
______  FLATWORK RES
______  GAS RELEASE
______  WATER REGISTER
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  ELECT FINAL RES
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  FLATWORK RES
______  FLATWORK RES
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)