Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/23/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-01409
JOB ADDRESS:
15731 CHERRY BLOSSOM RD
FRISCO, TX 75033
DESC:   3362 AC, 4082 SF, 2 STORY
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC
SAN DIEGO CA 92121-1970

CONTRACTOR:
M/I HOMES
405 STATE HIGHWAY 121 BYPASS
LEWISVILLE TX 75067
ISSUED DATE:
5/1/2020
APPLIED DATE:
4/21/2020
EXPIRED DATE:
3/21/2021
SITE APN:
D730643
STATUS:
COMPLETED
APPLICANT:
M/I HOMES
405 STATE HIGHWAY 121 BYPASS
LEWISVILLE TX 75067
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 05/06/2020 ZM$80.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,421.24
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL FEE$122.46
RESIDENTIAL MECHANICAL FEE$139.50
RESIDENTIAL PLUMBING FEE$249.00
WATER IMPACT FEE$464.00
SEWER IMPACT FEE$1,619.00
PTO AND MECH ROUGH 07/06/2020 DOT$30.00
PTO AND MECH ROUGH 07/07/2020 DOT$30.00
PTO AND MECH ROUGH 07/08/2020 DOT$30.00
CREDIT CARD FEE$6.00
CREDIT CARD FEE$11.50
CREDIT CARD FEE$1.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.20
CREDIT CARD FEE$1.80
CREDIT CARD FEE$11.80
2NDS AND FRAMING 07/14/2020 JDR$30.00
INSULATION RES 07/20/2020 JDR$30.00
INSULATION RES 07/21/2020 JDR$30.00
DRYWALL RES 07/24/2020 JDR$30.00
FLATWORK RES 08/19/2020 JDW2$30.00
FLATWORK RES 08/20/2020 JDW2$30.00
ELECT FINAL RES 08/21/2020 JDW2$30.00
UTILITIES INSPECTION 09/17/2020 NMN$90.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
Total Fees:$5,917.10
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  BRICKWALL TIES RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  GAS RELEASE
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  TREE
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)