|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/16/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-01263
|
JOB ADDRESS: 2578 EUCALYPTUS RD FRISCO, TX 75033 |
DESC:
2719 AC, 3486 SF, 1 STORY |
|
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC SAN DIEGO CA 92121-1970
|
CONTRACTOR:
M/I HOMES
405 STATE HIGHWAY 121 BYPASS LEWISVILLE TX 75067
|
ISSUED DATE: 5/20/2020
APPLIED DATE:3/19/2020
EXPIRED DATE:5/1/2021
SITE APN:D730558
STATUS:COMPLETED
|
|
APPLICANT:
M/I HOMES
405 STATE HIGHWAY 121 BYPASS LEWISVILLE TX 75067
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,225.24 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL FEE | $104.58 |
RESIDENTIAL MECHANICAL FEE | $113.00 |
RESIDENTIAL PLUMBING FEE | $219.00 |
WATER IMPACT FEE | $464.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
SLAB RES 06/17/2020 JDR | $30.00 |
2NDS AND FRAMING 08/05/2020 JDW2 | $30.00 |
2NDS AND FRAMING 08/10/2020 JDW2 | $30.00 |
FLATWORK RES 10/01/2020 JDW2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
UTILITIES INSPECTION 10/29/2020 NMN | $90.00 |
UTILITIES INSPECTION 10/23/2020 NMN | $90.00 |
CREDIT CARD FEE | $1.80 |
Total Fees: | $5,007.32 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|