BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/20/2021
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B20-01128
|
JOB ADDRESS: 3330 ELDORADO PKWY FRISCO, TX 75033 |
DESC:
54828 SF, GENESIS METRO CHURCH |
|
OWNER:
GENESIS METRO CHURCH FRISCO
FRISCO TX 75033
|
CONTRACTOR:
Goff Construction Services, LLC
2221 LAKESIDE BLVD RICHARDSON TX 75082
|
ISSUED DATE: 1/27/2022
APPLIED DATE:3/12/2020
EXPIRED DATE:10/22/2024
SITE APN:ADD265017
STATUS:COMPLETED
|
|
APPLICANT:
PHILLIP D DYE - OWT ARCHITECTS
509 PECAN STREET FORT WORTH TX 76102
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 13348162
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB COMM 07/25/2022 CW | $35.00 |
ELECT ROUGH COMM 01/13/2023 CW | $35.00 |
BRICKWALL TIE COMM 02/22/2023 CW | $35.00 |
FRAME AND ELEC WALL 04/11/2023 CW | $35.00 |
FRAME COMM 04/13/2023 CW | $35.00 |
PIER COMM 06/16/2023 CW | $35.00 |
FLATWORK COMM 06/16/2023 CW | $35.00 |
FLATWORK COMM 07/18/2023 CW | $35.00 |
FLATWORK COMM 07/20/2023 CW | $35.00 |
FLATWORK COMM 07/20/2023 CW | $35.00 |
FLATWORK COMM 07/20/2023 CW | $35.00 |
CEILING 08/22/2023 CW | $35.00 |
FLATWORK COMM 09/07/2023 CW | $35.00 |
COMM CO 10/12/2023 CW | $35.00 |
CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $4.00 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $3.50 |
PERCENT CREDIT CARD FEE | $3.57 |
PERCENT CREDIT CARD FEE | $4.90 |
PERCENT CREDIT CARD FEE | $0.70 |
PERCENT CREDIT CARD FEE | $0.70 |
2 INCH T-10 METER | $1,000.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
COMMERCIAL FEE | $2,223.12 |
COMMERCIAL BUILDING PERMIT FEE | $26,704.86 |
COMMERCIAL MECHANICAL FEE | $2,771.40 |
COMMERCIAL PLUMBING FEE | $4,964.52 |
THOROUGHFARE IMPACT FEE | $271,219.00 |
WATER IMPACT FEE | $41,788.00 |
SEWER IMPACT FEE | $21,428.00 |
PLAN REVIEW FEE | $100.00 |
MISCELLANEOUS FEE | $0.00 |
PLAN REVIEW FEE | $100.00 |
PLAN REVIEW FEE | $100.00 |
PLAN REVIEW FEE | $100.00 |
2 INCH T-10 METER | $1,000.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
Total Fees: | $376,210.27 |
|
|
| ______ T-POLE COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PIER COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ FOOTINGS COMM |
______ PLUMBING ROUGH-IN |
______ COURTESY FIRE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK COMM |
______ ELECT ROUGH COMM |
______ FOOTINGS COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FOOTINGS COMM |
______ FLATWORK COMM |
______ SLAB COMM |
______ SLAB COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FIRELANE INSPECTION |
______ FOOTINGS COMM |
______ ELECT ROUGH COMM |
______ PLUMBING ROUGH-IN |
______ SLAB COMM |
______ GREASE TRAP |
______ FRAME COMM |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMBING ROUGH-IN |
______ PLUMB TOP OUT COMM |
______ GAS PRESSURE |
______ ELECT ROUGH COMM |
______ PLUMB TOP OUT COMM |
______ MECHANICAL ROUGH |
______ FRAME COMM |
______ BRICKWALL TIE COMM |
______ ELECT ROUGH COMM |
______ MECHANICAL ROUGH |
______ INSULATION COMM |
______ PLUMB TOP OUT COMM |
______ INSULATION COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ FOOTINGS COMM |
______ FOOTINGS COMM |
______ BRICKWALL TIE COMM |
______ METER PAYMENT |
______ BRICKWALL TIE COMM |
______ SET 2 T-10 METER |
______ PLUMB TOP OUT COMM |
______ CMUWALL |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ METER PAYMENT |
______ SET 2 T-10 METER |
______ FRAME AND ELEC WALL |
______ FRAME COMM |
______ FRAME COMM |
______ INSULATION COMM |
______ FRAME COMM |
______ BRICKWALL TIE COMM |
______ FLATWORK COMM |
______ INSULATION COMM |
______ FLATWORK COMM |
______ MECHANICAL ROUGH |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ ELECT ROUGH COMM |
______ GAS PRESSURE |
______ PIER COMM |
______ FLATWORK COMM |
______ LATH COMM |
______ GAS PRESSURE |
______ CEILING |
______ FOOTINGS COMM |
______ ELECT ROUGH COMM |
______ FOOTINGS COMM |
______ PIER COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ CEILING |
______ CEILING |
______ LATH COMM |
______ LATH COMM |
______ LATH COMM |
______ ELECT RELEASE COMM |
______ ELECT RELEASE COMM |
______ LATH COMM |
______ LATH COMM |
______ ELECT RELEASE COMM |
______ FOOTINGS COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ LATH COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ GAS RELEASE |
______ LATH COMM |
______ FLATWORK COMM |
______ FOOTINGS COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ CEILING |
______ FLATWORK COMM |
______ CEILING |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ CEILING |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ FOOTINGS COMM |
______ FOOTINGS COMM |
______ FOOTINGS COMM |
______ ELECT FINAL COMM |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ COMM CO |
______ ELECT FINAL COMM |
______ COURTESY HEALTH INSP |
______ FIRE FINAL |
______ COMM CO |
______ FIRE FINAL |
______ HEALTH FINAL |
______ COMM CO |
______ FIRE FINAL |
______ ELEVATOR |
______ COMM CO |
______ COMM CO |
______ COMM CO |
______ COMM CO |
______ COMM CO |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|