|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/14/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-00458
|
JOB ADDRESS: 16527 LUPINE RD FRISCO, TX 75033 |
DESC:
3582 AC, 4414 SF, 2 STORY |
|
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC SAN DIEGO CA 92121-1970
|
CONTRACTOR:
LANDON HOMES
4050 W PARK BLVD PLANO TX 75093
|
ISSUED DATE: 2/24/2020
APPLIED DATE:1/30/2020
EXPIRED DATE:3/7/2021
SITE APN:D730450
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
4050 W PARK BLVD PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 08/31/2020 AMM2 | $30.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 03/09/2020 EEM | $80.00 |
SET 1 PD METER 03/10/2020 ZM | $80.00 |
PLUMBING ROUGH-IN 03/16/2020 CCM | $30.00 |
PTO AND MECH ROUGH 06/04/2020 CCM | $30.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,527.48 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL FEE | $132.42 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL PLUMBING FEE | $270.00 |
WATER IMPACT FEE | $387.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $5.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $12.40 |
CREDIT CARD FEE | $0.60 |
T-POLE RES 03/09/2020 GLQ | $30.00 |
2NDS AND FRAMING 06/17/2020 JDR | $30.00 |
2NDS AND FRAMING 06/30/2020 JDR | $30.00 |
2NDS AND FRAMING 07/02/2020 JDR | $30.00 |
FLATWORK RES 08/10/2020 JDW2 | $30.00 |
FLATWORK RES 08/12/2020 JDW2 | $30.00 |
FLATWORK RES 08/03/2020 MS2 | $30.00 |
UTILITIES INSPECTION 08/21/2020 NMN | $90.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $6,039.40 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ TREE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|