Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/21/2020 PERMIT SUB-TYPE: CIFO PERMIT NO: B20-00321
JOB ADDRESS:
3290 MAIN ST 204
FRISCO, TX 75033
DESC:   1592 SF, BE BALANCED
OWNER:
TEEL CROSSING PARTNERS, LTD

DALLAS TX 75205-2726

CONTRACTOR:
CTS CONSTRUCTION LP
3021 RIDGE RD SUITE A-31
ROCKWALL TX 75032
ISSUED DATE:
2/24/2020
APPLIED DATE:
1/27/2020
EXPIRED DATE:
1/1/2021
SITE APN:
D733212
STATUS:
COMPLETED
APPLICANT:
708 STUDIOS INC
PO BOX 54242
FRISCO TX 75035
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
100000
FEE SUMMARY
INSPECTION SUMMARY
CEILING 04/22/2020 CW$35.00
GAS RELEASE 04/27/2020 DOT$35.00
CREDIT CARD FEE$19.46
CREDIT CARD FEE$0.70
CREDIT CARD FEE$2.10
COMMERCIAL BUILDING PERMIT FEE$596.25
COMMERCIAL FEE$93.68
COMMERCIAL MECHANICAL FEE$109.60
COMMERCIAL PLUMBING FEE$173.28
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$50.00
ELECT ROUGH COMM 03/12/2020 REED$35.00
ELECT ROUGH COMM 03/13/2020 REED$35.00
Total Fees:$1,235.07
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  INSULATION COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  AUTOFIRE SPRK VISUAL
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  CEILING
______  GAS RELEASE
______  CEILING
______  GAS RELEASE
______  BRICKWALL TIE COMM
______  GAS RELEASE
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)