BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/28/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-00206
|
JOB ADDRESS: 7751 PIEDMONT AVE FRISCO, TX 75035 |
DESC:
2252 AC, 2827 SF, 1 STORY |
|
OWNER:
TOLL SOUTHWEST LLC
GRAPEVINE TX 76051-7093
|
CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
ISSUED DATE: 2/12/2020
APPLIED DATE:1/15/2020
EXPIRED DATE:3/3/2021
SITE APN:C2782658
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING RES 04/13/2020 ARG | $30.00 |
FLATWORK RES 06/11/2020 ARG | $30.00 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL BUILDING PERMIT FEE | $1,299.45 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $84.81 |
RESIDENTIAL MECHANICAL FEE | $113.00 |
RESIDENTIAL PLUMBING FEE | $228.00 |
WATER IMPACT FEE | $1,847.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 07/16/2020 NMN | $90.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 08/19/2020 NMN | $90.00 |
UTILITIES INSPECTION 08/24/2020 NMN | $90.00 |
SLAB RES 03/11/2020 REED | $30.00 |
CO AND BUILD FINAL 08/28/2020 WND | $30.00 |
Total Fees: | $6,679.06 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ ELECT ROUGH RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ TREE |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|