Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/22/2020 PERMIT SUB-TYPE: SNEW PERMIT NO: B20-00160
JOB ADDRESS:
10355 LAST STAND CIR
FRISCO, TX 75035
DESC:   4699 AC, 5801 SF, 2 STORY
OWNER:
MATTHEWS CHARLES HARRISON & TANIESHA EBONY

FRISCO TX 75033-8062

CONTRACTOR:
TOWER RESIDENTIAL & DEV SERVICES LLC
7509 INWOOD #204
DALLAS TX 75209
ISSUED DATE:
1/24/2020
APPLIED DATE:
1/3/2020
EXPIRED DATE:
4/6/2022
SITE APN:
C930416
STATUS:
COMPLETED
APPLICANT:
TOWER RESIDENTIAL & DEV SERVICES LLC
7509 INWOOD #204
DALLAS TX 75209
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$435.00
WATER METER DEPOSIT$125.00
PLAN REVIEW FEE$100.00
PTO AND MECH ROUGH 08/20/2020 DOT$30.00
PTO AND MECH ROUGH 08/28/2020 DOT$30.00
ELECT FINAL RES 06/28/2021 DW2$30.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$3.00
CREDIT CARD FEE$3.60
CREDIT CARD FEE$4.62
CREDIT CARD FEE$3.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.20
CREDIT CARD FEE$3.80
CREDIT CARD FEE$2.00
CREDIT CARD FEE$2.00
2NDS AND FRAMING 10/09/2020 GLQ$30.00
2NDS AND FRAMING 10/14/2020 GLQ$30.00
2NDS AND FRAMING 10/16/2020 GLQ$30.00
INSULATION RES 10/27/2020 GLQ$30.00
INSULATION RES 10/28/2020 GLQ$30.00
DRYWALL RES 11/10/2020 GLQ$30.00
RESIDENTIAL BUILDING PERMIT FEE$3,075.16
FENCE FEE$20.00
RESIDENTIAL FEE$265.98
RESIDENTIAL MECHANICAL FEE$211.50
RESIDENTIAL PLUMBING FEE$438.00
PLUMBING ROUGH-IN 01/31/2020 MLM$30.00
PLUMBING ROUGH-IN 02/06/2020 MLM$30.00
FIRE DEPT INSPECTION FEES$140.97
UTILITIES INSPECTION 02/28/2020 NMN$90.00
UTILITIES INSPECTION 03/06/2020 NMN$90.00
UTILITIES INSPECTION 06/25/2021 NMN$90.00
UTILITIES INSPECTION 07/01/2021 NMN$90.00
UTILITIES INSPECTION 07/02/2021 NMN$100.00
UTILITIES INSPECTION 09/14/2021 NMN$100.00
UTILITIES INSPECTION 10/05/2021 NMN$100.00
ELECT FINAL RES 06/25/2021 PJF$30.00
ELECT FINAL RES 06/30/2021 PJF$30.00
BRICKWALL TIES RES 08/06/2020 RWT$30.00
BRICKWALL TIES RES 09/14/2020 RWT$30.00
PLUMBING TOP OUT 07/13/2020 SDC$30.00
PTO AND MECH ROUGH 07/16/2020 SDC$30.00
SLAB RES 02/27/2020 VCS$30.00
SLAB RES 03/05/2020 VCS$30.00
Total Fees:$6,069.03
______  PLUMBING ROUGH-IN
______  METER PAYMENT
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  SLAB RES
______  UTILITIES INSPECTION
______  SLAB RES
______  UTILITIES INSPECTION
______  SLAB RES
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  MECHANICAL
______  PLUMBING TOP OUT
______  MECHANICAL FINAL
______  PTO AND MECH ROUGH
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  FLATWORK RES
______  BRICKWALL TIES RES
______  MECHANICAL
______  ELECT FINAL RES
______  MECHANICAL
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PLUMBING ROUGH-IN
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  BRICKWALL TIES RES
______  2NDS AND FRAMING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  INSULATION RES
______  INSULATION RES
______  FIREINSULATION
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  ELECT FINAL RES
______  MECHANICAL FINAL
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  AUTOFIRE SPRK VISUAL
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)