|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/22/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-00120
|
JOB ADDRESS: 6798 TAILWATER TRL FRISCO, TX 75036 |
DESC:
3082 AC, 3790 SF, 2 STORY |
|
OWNER:
TOLL BROTHERS INC
GRAPEVINE TX 76051-7094
|
CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
ISSUED DATE: 1/31/2020
APPLIED DATE:1/8/2020
EXPIRED DATE:3/24/2021
SITE APN:D705373
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 03/03/2020 AMM2 | $30.00 |
PTO AND MECH ROUGH 05/01/2020 AMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,625.70 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $113.70 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL PLUMBING FEE | $250.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $3.40 |
CREDIT CARD FEE | $1.20 |
2NDS AND FRAMING 05/12/2020 JDR | $30.00 |
2NDS AND FRAMING 05/15/2020 JDR | $30.00 |
SET 1 PD METER 03/03/2020 DDH | $80.00 |
2NDS AND FRAMING 05/11/2020 RWT | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $435.00 |
Total Fees: | $8,588.00 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|