|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/9/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B20-00018
|
JOB ADDRESS: 8118 BLOOMDALE DR FRISCO, TX 75036 |
DESC:
2631 AC, 3385 SF, 1 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
COPPELL TX 75019-4795
|
CONTRACTOR:
PULTE HOMES
9111 CYPRESS WATERS #100 COPPELL TX 75019
|
ISSUED DATE: 1/10/2020
APPLIED DATE:12/20/2019
EXPIRED DATE:12/13/2020
SITE APN:D744826
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
9111 CYPRESS WATERS #100 COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 01/15/2020 CAW2 | $80.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,490.90 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $101.55 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL PLUMBING FEE | $205.00 |
WATER IMPACT FEE | $1,496.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.20 |
SLAB RES 02/21/2020 JDR | $30.00 |
SLAB RES 02/24/2020 JDR | $30.00 |
SLAB RES 02/25/2020 JDR | $30.00 |
2NDS AND FRAMING 03/25/2020 JDR | $30.00 |
ELECT FINAL RES 05/04/2020 JDR | $30.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $4,264.55 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|