|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/9/2020
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-05601
|
JOB ADDRESS: 16575 TRUMPET VINE RD FRISCO, TX 75033 |
DESC:
3649 AC, 4509 SF, 2 STORY |
|
OWNER:
DREES CUSTOM HOMES LP
IRVING TX 75038-2283
|
CONTRACTOR:
DREES CUSTOM HOMES
6225 SH 161 STE 100 IRVING TX 75038
|
ISSUED DATE: 2/18/2020
APPLIED DATE:12/26/2019
EXPIRED DATE:2/3/2021
SITE APN:D695836
STATUS:COMPLETED
|
|
APPLICANT:
DREES CUSTOM HOMES
6225 SH 161 STE 100 IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $7.60 |
2NDS AND FRAMING 04/14/2020 GLQ | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,857.79 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL PLUMBING FEE | $285.00 |
RESIDENTIAL FEE | $135.27 |
FENCE FEE | $20.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER IMPACT FEE | $635.00 |
GAS RELEASE 05/26/2020 MRT | $30.00 |
2NDS AND FRAMING 04/09/2020 MS2 | $30.00 |
UTILITIES INSPECTION 07/15/2020 NMN | $90.00 |
REPLACE READABLE REGISTER | $290.00 |
Total Fees: | $5,750.46 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|