|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/6/2020
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B19-05381
|
JOB ADDRESS: 9560 LEGACY DR #230 FRISCO, TX 75033 |
DESC:
2497 SF, ON POINT DENTISTRY |
|
OWNER:
SIRIS LEGACY LLC
FRISCO TX 75036-8142
|
CONTRACTOR:
MED-TECH CONSTRUCTION
106 INDUSTRIAL DR FATE TX 75126
|
ISSUED DATE: 1/6/2020
APPLIED DATE:12/16/2019
EXPIRED DATE:9/14/2020
SITE APN:D699316
STATUS:COMPLETED
|
|
APPLICANT:
MED-TECH CONSTRUCTION
106 INDUSTRIAL DR FATE TX 75126
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 266000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECT FINAL COMM 03/06/2020 CW | $35.00 |
PLUMB TOP OUT COMM 01/28/2020 DOT | $35.00 |
MECHANICAL FINAL 03/09/2020 DOT | $35.00 |
CREDIT CARD FEE | $32.67 |
CREDIT CARD FEE | $2.70 |
CREDIT CARD FEE | $1.70 |
CREDIT CARD FEE | $1.70 |
CREDIT CARD FEE | $1.40 |
COMMERCIAL BUILDING PERMIT FEE | $50.00 |
COMMERCIAL FEE | $129.88 |
COMMERCIAL BUILDING PERMIT FEE | $1,094.25 |
COMMERCIAL MECHANICAL FEE | $154.85 |
COMMERCIAL PLUMBING FEE | $254.73 |
FIRE DEPT INSPECTION FEES | $74.91 |
FIRE DEPT INSPECTION FEES | $50.00 |
INSULATION COMM 01/17/2020 REED | $35.00 |
PLUMBING ROUGH-IN 01/16/2020 SDC | $30.00 |
MECHANICAL ROUGH 01/16/2020 SDC | $30.00 |
Total Fees: | $2,048.79 |
|
|
| ______ FRAME AND ELEC WALL |
______ FRAME COMM |
______ MECHANICAL ROUGH |
______ PLUMBING ROUGH-IN |
______ PLUMB TOP OUT COMM |
______ MEDGASROUGH |
______ ELECT ROUGH COMM |
______ PLUMB TOP OUT COMM |
______ MEDGASROUGH |
______ PLUMBING ROUGH-IN |
______ MECHANICAL ROUGH |
______ INSULATION COMM |
______ MECHANICAL ROUGH |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMBING ROUGH-IN |
______ DRYWALL COMM |
______ DRYWALL COMM |
______ ELECT RELEASE COMM |
______ SLAB COMM |
______ MEDGASROUGH |
______ CEILING |
______ AUTOFIRE SPRK HYDRO |
______ CEILING |
______ ELECT FINAL COMM |
______ MEDGASFINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ ELECT FINAL COMM |
______ MEDGASFINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FIRE FINAL |
______ COMM CO |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|